Stay informed about the latest developments in skid-mounted PV systems, prefabricated photovoltaic containers, containerized energy solutions, and renewable energy innovations across Africa.
In recent decades, renewable energy efforts in Liechtenstein have also branched out into solar energy production. Most solar energy is generated by photovoltaic arrays mounted on buildings (usually roofing), rather than dedicated solar power stations.
Energy production from renewables consisted of 27,71 % hydropower production (8,91 % imported and 18,80 % domestic), as well as 4,76 % produced domestically from solar energy. Liechtenstein's overall energy production from renewables consisted of 8,91 % imports and of 23,56 % domestic, non-export production.
Liechtenstein has used hydroelectric power stations since the 1920s as its primary source of domestic energy production. By 2018, the country had 12 hydroelectric power stations in operation (4 conventional/pumped-storage and 8 fresh water power stations). Hydroelectric power production accounted for roughly 18 - 19% of domestic needs.
Lawena Power Station is the oldest in the country, opened in 1927. The power station underwent reconstructions in 1946 and 1987. Today, it also includes a small museum on the history of electricity production in Liechtenstein. Samina Power Station, currently the largest of the domestic power stations, has been operational since December 1949.
Image: The recently launched 20MW solar energy plant in South Sudan. Credit: Ezra Group A public-private partnership in South Sudan has launched the country’s first major solar power plant and Battery Energy Storage System (BESS) in the capital Juba, where it is expected to provide electricity to thousands of homes.
The solar farm will have an attached battery energy storage system rated at 35MWh. The off-taker is the South Sudanese Ministry of Electricity, Dams, Irrigation and Water Resources, represented by South Sudan Electricity Corporation, the national electric utility parastatal company.
This power station is an attempt to (a) diversify the country's generation mix (b) increase the country's generation capacity and (c) increase the number of South Sudan's homes, businesses and industries connected to the national grid. The power station is reported to cost an estimated US$45 million to construct.
"South Sudan: Asunim and I-kWh join the Juba solar project (20 MWp)". Afrik21.arica. Paris, France. Retrieved 2 June 2022. ^ Carmen (9 February 2022). "Juba Solar PV Park, South Sudan". Power-Technology. New York City. Retrieved 2 June 2022. ^ a b Maria Gallucci (13 March 2020). "South Sudan Is Building Its Electric Grid Virtually From Scratch".
Most of the BESS systems are composed of securely sealed battery packs, which are electronically monitored and replaced once their performance falls below a given threshold. Batteries suffer from cycle ageing, or deterioration caused by charge–discharge cycles.
The system is built of two main blocks. The PCS building block, responsible for the main control of the mobile BESS. The nominal power rating of the PCS block is 225 kVA, with a maximum peak power in the peak shaving mode of 275 kW . The second block is the modular battery pack.
These all-in-one BESS systems can be scaled from utility scale to industrial and commercial applications. The environmental control system (ECS) within the container combines the fire and HVAC systems to maintain a stable environment.
This thesis project, carried out at Northvolt Systems, aims to analyze the existing and readily used communication interfaces for a specific set of mobile BESS applications. The analysis is performed by a literature review of typical mobile BESS applications with the identified corresponding communication interfaces.